Traffic detour St. Peters Main Road

Homes in St. Peters to be connected onto the main Sewage line”

 As of Saturday August 6th 2016, the entrance to the St. Peters main Road, from the L.B. Scott road, will be closed for a period of maximum one week, to enable the Contractor Designer’s Choice N.V.

to connect the St. Peters road main sewage line onto the existing sewage line in the L.B. Scott road.

 

The execution of the works will commence Saturday morning at 9:00 am with the closure of the St. Peters main road. During the execution of the works, residence residing on the St. Peters main road will have access to their homes by means of a detour via the Messaple road.

 

During the execution of the project  the detour from St. Peters to L.B. Scott road and vice versa will be directed thru the Mesapple road . Marigot hill road will remain a one way road to the L.B. Scott road as presently is the situation.

 

The overall objective of the project is to connect the homes alongside the main road of St. Peters onto the main sewage line in the L.B. Scott road that will further transport  the waste water to the Waste Water Treatment Plant,  located at the A.T. illidge road.

With the connecting of the homes onto the main sewerage lines, the existing issues of running sewerage water on the main road of St. Peters will be eliminated and will be something of the past.

 

During the execution of the project the residents of St. Peters and Motorists that utilize the St. Peters road and the L.B. Scott Road will experience some inconvenience.

 

Further information about the Project “St. Peters house connection” can be obtained at Ministry of VROMI, Department of New Projects Development and Planning, tel. 542-4289, Project Manager, Bako Maynard email. ba**********@si************.org and/or Department Head New Projects Development and Planning, ing. Kurt A. Ruan or by e-mail: ku*******@si************.org.